Location: Taichung Taiwan
Distance: 1367m
Depth: 40m
Horizontal Curve: 1500m
Entry Angle: 12deg
Exit Angle: 10deg
Ground: Cobble, Clay and Sand
Pipeline: 36” steel pipeJob
Description:
The crossing was completed by Intersect method, using the ParaTrack Gyro Module drilling from the south (1097m) and underground coil drilling from the North, at which point the ParaTrack Steering Tool was in range of the AC Beacon and surface coil. The intersect was completed without any ranging due to the vertical and horizontal accuracy of the GyroModule, Beacon and surface coil tracking combination.